Procesos colaborativos para implementar la metodología BIM en tiempos de ejecución en obra – caso de estudio Multifamiliar VIS Panoramik
dc.contributor.advisor | Nope Bernal, Yuber Alberto | |
dc.contributor.author | Bedoya Salamanca, Maria Paula | |
dc.creator.degree | Arquitecto(a) | spa |
dc.date.accessioned | 2024-01-15T22:53:19Z | |
dc.date.available | 2024-01-15T22:53:19Z | |
dc.date.issued | 2023 | |
dc.description | Con el transcurso del tiempo la evolución tecnológica ha abarcado aspectos importantes para el desarrollo de cualquier proceso, incluyendo así beneficios positivos para la humanidad, resaltando en el sector de la construcción diferentes estudios metodológicos innovadores que se han ido implementando según las necesidades de los proyectos constructivos, uno de los principales conocimientos es el BIM (Building information modeling) lo cual significa realizar un procedimiento de recolección de información centralizada en tiempo real en las etapas de diseño, obra y entrega en el ciclo de vida de un proyecto. Muchos aspectos positivos se resaltan si se pone en funcionamiento este proceso en la fase de planeación y ejecución, ya que esto ayudara a optimizar en tiempos y costos, así mismo mejorar la productividad de las empresas constructoras. A causa de estos nuevos cambios tecnológicos el objetivo de este trabajo investigativo es informar como de manera dinámica empresas constructoras pueden obtener conocimientos de los conceptos básicos para implementar la metodología BIM mediante el trabajo colaborativo en procesos puntuales para el desarrollo de obra, esto se logró a partir de experiencias, datos y estadísticas de trabajo, encontrando varios problemas en la parte de coordinación de diseño-obra y la no aplicación de las normas de implementación durante el proceso, dando como resultado sobrecostos e imprevistos que no se tuvieron en cuenta en el desarrollo del proyecto, por otra parte se busca realizar una comparación de cómo se llevan a cabo actividades con metodología tradicional (CAD) vs propuesta de mejoramiento para el control de obra mediante la metodología BIM. | spa |
dc.description.abstract | Over time, technological evolution has made important aspects for the development of any process, thus including positive benefits for humanity, highlighting in the construction sector different innovative methodological studies that have been implemented according to the needs of construction projects. , one of the main knowledge is BIM (Building information modeling) which means carrying out a centralized information gathering procedure in real time in the design, construction and delivery stages in the life cycle of a project. Many positive aspects are highlighted if this process is put into operation in the planning and execution phase, since this will help to optimize time and costs, as well as improve the productivity of construction companies. Due to these new technological changes, the objective of this investigative work is to inform how construction companies can dynamically obtain knowledge of the basic concepts to implement the BIM methodology through collaborative work in specific processes for the development of work, this will be modified to based on experiences, data and work statistics, finding several problems in the design-work coordination part and the non-application of implementation standards during the process, resulting in cost overruns and unforeseen events that were not taken into account in the development of the project, on the other hand, it seeks to make a comparison of how activities are carried out with traditional methodology (CAD) vs. improvement proposal for the control of work through the BIM methodology. | spa |
dc.identifier.uri | http://hdl.handle.net/11396/8030 | |
dc.language.iso | spa | |
dc.publisher | Universidad La Gran Colombia | spa |
dc.publisher.branch | Bogotá | spa |
dc.publisher.department | Arquitectura | spa |
dc.publisher.program | Arquitectura | spa |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Procesos de obra | spa |
dc.subject | Flujos de trabajo | spa |
dc.subject | Implementación metodología BIM | spa |
dc.subject | Trabajo colaborativo | spa |
dc.subject.keyword | Collaborative work | spa |
dc.subject.keyword | Work flows | spa |
dc.subject.keyword | BIM methodology implementation | spa |
dc.subject.keyword | Work processes | spa |
dc.subject.lemb | Administración de proyectos - Programas para computador | spa |
dc.subject.lemb | Evaluación de proyectos | spa |
dc.title | Procesos colaborativos para implementar la metodología BIM en tiempos de ejecución en obra – caso de estudio Multifamiliar VIS Panoramik | spa |
Archivos
Bloque original
1 - 2 de 2
Cargando...
- Nombre:
- Bedoya_Maria_2023.pdf
- Tamaño:
- 1.49 MB
- Formato:
- Adobe Portable Document Format
- Descripción:
- Trabajo de grado
No hay miniatura disponible
- Nombre:
- Carta de autorizacion de publicación_2023 .pdf
- Tamaño:
- 292.81 KB
- Formato:
- Adobe Portable Document Format
- Descripción:
- Carta de autorización publicación
Bloque de licencias
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- license.txt
- Tamaño:
- 3.31 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción: