Procesos colaborativos para implementar la metodología BIM en tiempos de ejecución en obra – caso de estudio Multifamiliar VIS Panoramik

dc.contributor.advisorNope Bernal, Yuber Alberto
dc.contributor.authorBedoya Salamanca, Maria Paula
dc.creator.degreeArquitecto(a)spa
dc.date.accessioned2024-01-15T22:53:19Z
dc.date.available2024-01-15T22:53:19Z
dc.date.issued2023
dc.descriptionCon el transcurso del tiempo la evolución tecnológica ha abarcado aspectos importantes para el desarrollo de cualquier proceso, incluyendo así beneficios positivos para la humanidad, resaltando en el sector de la construcción diferentes estudios metodológicos innovadores que se han ido implementando según las necesidades de los proyectos constructivos, uno de los principales conocimientos es el BIM (Building information modeling) lo cual significa realizar un procedimiento de recolección de información centralizada en tiempo real en las etapas de diseño, obra y entrega en el ciclo de vida de un proyecto. Muchos aspectos positivos se resaltan si se pone en funcionamiento este proceso en la fase de planeación y ejecución, ya que esto ayudara a optimizar en tiempos y costos, así mismo mejorar la productividad de las empresas constructoras. A causa de estos nuevos cambios tecnológicos el objetivo de este trabajo investigativo es informar como de manera dinámica empresas constructoras pueden obtener conocimientos de los conceptos básicos para implementar la metodología BIM mediante el trabajo colaborativo en procesos puntuales para el desarrollo de obra, esto se logró a partir de experiencias, datos y estadísticas de trabajo, encontrando varios problemas en la parte de coordinación de diseño-obra y la no aplicación de las normas de implementación durante el proceso, dando como resultado sobrecostos e imprevistos que no se tuvieron en cuenta en el desarrollo del proyecto, por otra parte se busca realizar una comparación de cómo se llevan a cabo actividades con metodología tradicional (CAD) vs propuesta de mejoramiento para el control de obra mediante la metodología BIM.spa
dc.description.abstractOver time, technological evolution has made important aspects for the development of any process, thus including positive benefits for humanity, highlighting in the construction sector different innovative methodological studies that have been implemented according to the needs of construction projects. , one of the main knowledge is BIM (Building information modeling) which means carrying out a centralized information gathering procedure in real time in the design, construction and delivery stages in the life cycle of a project. Many positive aspects are highlighted if this process is put into operation in the planning and execution phase, since this will help to optimize time and costs, as well as improve the productivity of construction companies. Due to these new technological changes, the objective of this investigative work is to inform how construction companies can dynamically obtain knowledge of the basic concepts to implement the BIM methodology through collaborative work in specific processes for the development of work, this will be modified to based on experiences, data and work statistics, finding several problems in the design-work coordination part and the non-application of implementation standards during the process, resulting in cost overruns and unforeseen events that were not taken into account in the development of the project, on the other hand, it seeks to make a comparison of how activities are carried out with traditional methodology (CAD) vs. improvement proposal for the control of work through the BIM methodology.spa
dc.identifier.urihttp://hdl.handle.net/11396/8030
dc.language.isospa
dc.publisherUniversidad La Gran Colombiaspa
dc.publisher.branchBogotáspa
dc.publisher.departmentArquitecturaspa
dc.publisher.programArquitecturaspa
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectProcesos de obraspa
dc.subjectFlujos de trabajospa
dc.subjectImplementación metodología BIMspa
dc.subjectTrabajo colaborativospa
dc.subject.keywordCollaborative workspa
dc.subject.keywordWork flowsspa
dc.subject.keywordBIM methodology implementationspa
dc.subject.keywordWork processesspa
dc.subject.lembAdministración de proyectos - Programas para computadorspa
dc.subject.lembEvaluación de proyectosspa
dc.titleProcesos colaborativos para implementar la metodología BIM en tiempos de ejecución en obra – caso de estudio Multifamiliar VIS Panoramikspa

Archivos

Bloque original
Mostrando 1 - 2 de 2
Cargando...
Miniatura
Nombre:
Bedoya_Maria_2023.pdf
Tamaño:
1.49 MB
Formato:
Adobe Portable Document Format
Descripción:
Trabajo de grado
No hay miniatura disponible
Nombre:
Carta de autorizacion de publicación_2023 .pdf
Tamaño:
292.81 KB
Formato:
Adobe Portable Document Format
Descripción:
Carta de autorización publicación
Bloque de licencias
Mostrando 1 - 1 de 1
No hay miniatura disponible
Nombre:
license.txt
Tamaño:
3.31 KB
Formato:
Item-specific license agreed upon to submission
Descripción:

Colecciones