Programación por el método de lineas de balance, frente a la programación linealen un caso de estudio
dc.contributor.advisor | Lara Mateus, Andrea del Pilar | |
dc.contributor.author | Yate Agudelo, Daniel Leonardo | |
dc.contributor.author | Parra Riveros, Jefferson Alejandro | |
dc.creator.degree | Tecnólogo(a) en construcciones arquitectónicas | spa |
dc.date.accessioned | 2019-05-27T17:04:06Z | |
dc.date.available | 2019-05-27T17:04:06Z | |
dc.date.issued | 2018 | |
dc.description | Este proyecto de investigación consiste en la descripción y análisis de dos métodos de programación (lineal, no lineal) utilizados actualmente en proyectos de arquitectura. De acuerdo a esto se dio la tarea de conocer los diferentes métodos y herramientas existentes en la actualidad, como lo es el método por barras de GANTT, CPM Y PERT. A través de la historia de la construcción los sistemas de planeación han evolucionado, pero a medida que transcurre el tiempo y estos son utilizados en distintos proyectos, se han identificado inconvenientes y desventajas en su aplicación, pero así como muchas de estasprogramaciones han tenido transformaciones a medida que trascurre el tiempo, nuevos sistemas de planeación han surgido, como lo es la línea de balance o también llamado balanceo de líneas, que tiene su primera aparición en el año de 1940 por un grupo de trabajares liderado por el gerente George E. Fouch, es por ello, que se hace un conocimiento de los métodos de planeación actuales y se procede a evaluar la línea de balance como método alternativo de uso para futuras programaciones en proyectos de construcción. Fue necesario utilizar el programa de Excel como herramienta de graficación ya que no secontó para esta investigación con un sistema especializado en líneas de balance, se recopilo la información necesaria, se completó ya que al momento de realizar la transformación a líneas de balance era necesario contar con presupuesto, cuadrillas de trabajo etc? luego de su análisis y verificación por medio de fuentes alternas respecto al tema se procedió a tomar la programación lineal, se pasó a líneas de balance y se obtuvieron sus respectivas conclusiones | spa |
dc.description.abstract | This research project consists of the description and analysis of two programming methods currently used in architectural projects. According to this the task of knowing the different methods and tools existing today, was given as it is the method by CPM and PERT, GANTT bars. Through the history of the construction planning systems have evolved, but as it passes the time and these are used in various projects, identified disadvantages and disadvantages in your application, but as well as many of these schedules have had changes as time elapses, new planning systems have emerged, such as the line of balance or also called lines rolling, which is his first appearance in the year of 1940 a group of led shortly by Manager George E. Fouch, it is therefore makes a knowledge of current planning methods and proceed to evaluate the balance line as an alternative method of use for future programming in construction projects. It was necessary to use Excel and charting tool since not was for this research with a specialized system in balance lines, collect the necessary information, is already completed at the time of the transformation to of balance lines was necessary to have budget, gangs of work etc... then proceeded to take the linear programming analysis and verification through alternative sources on the issue, joined the lines of balance and their respective were obtained conclusions | spa |
dc.format.mimetype | application/pdf | |
dc.identifier.uri | http://hdl.handle.net/11396/3361 | |
dc.language.iso | spa | |
dc.publisher | Universidad La Gran Colombia | spa |
dc.publisher.branch | Bogotá | spa |
dc.publisher.department | Facultad de Arquitectura | spa |
dc.publisher.program | Tecnología en Construcciones Arquitectónicas | spa |
dc.rights.accesRights | info:eu-repo/semantics/openAccess | |
dc.rights.acceso | Abierto (Texto Completo) | spa |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/2.5/co/ | * |
dc.source | instname:Universidad La Gran Colombia | |
dc.source | reponame:Repositorio Institucional UGC | |
dc.subject | Líneas de balance | |
dc.subject | Barras de gantt | |
dc.subject | Programación | |
dc.subject.lemb | Programación lineal | |
dc.title | Programación por el método de lineas de balance, frente a la programación linealen un caso de estudio | spa |
dc.type | bachelor thesis | |
dc.type.hasversion | info:eu-repo/semantics/acceptedVersion | |
dc.type.spa | Trabajo de grado | spa |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- Programacion_metodo_lineas.pdf
- Tamaño:
- 9.36 MB
- Formato:
- Adobe Portable Document Format